[Construction Example] FRP Tank Repair Work
This is an example of repair work due to deterioration of FRP tanks, concerned about damage and liquid leakage caused by aging.
We would like to introduce a case study of the "FRP Tank Repair Work" that our company has carried out. A certain engine maintenance facility had concerns about damage and liquid leakage due to deterioration, and they faced the challenge of needing early repairs. Therefore, after diagnosing the deterioration condition, we submitted a report. Once the budget was secured, we proceeded with the repair work. 【Case Study】 ■ Manufacturing Days: None ■ Type of Work: Lining ■ Work Days: 12 days ■ Date/Location: December 2019/Tokyo ■ Equipment Used: FRP Lining *For more details, please refer to the PDF document or feel free to contact us.
- Company:関西化工
- Price:Other